A View From The Bridge Production Rental - Lyric Opera of Chicago

A View from the Bridge Production Rental

A View From the Bridge

William Bolcom
Director: Frank Galati
Set Designer: Santo Loquasto
Projection Designer:  Wendall K. Harrington
Costume Designer: Santo Loquasto
Lighting Designer: Duane Schuler
Year Built:  1999
Year Last Performed at LOC: 1999

Running Time:
Total:  2:30:00
2 Acts, 1 Intermission

Directorial and Music Staff:
DIRECTOR:  Frank Galati
ASSISTANT DIRECTOR:  Amy Hutchison
CONDUCTOR:  Dennis Russell Davies
PROJECTED ENGLISH TITLES BY:  Francis Rizzo

Scenery:
SET DESIGNER:  Santo Loquasto
YEAR BUILT: 1999
SET OWNED BY: Lyric Opera of Chicago
NUMBER AND SIZE OF CONTAINERS:  1 – 44'-3" and 1 – 44'6" Trailers
NUMBER OF LINES USED:  4 (not including house masking pipes)
NUMBER OF SPOT MOTORS:  5
TEASER HEIGHT: 27'-6"
TORMENTOR OPENING: 45'-0"
MIN. DEPTH OF SET:  50'-0"
TRAPS USED:  N/A
GROUNDCLOTH OR DECKING:  Cobblestone look decking pieces (jigsaw fit) – extends over apron custom fit for Lyric Opera stage
SCRIM:  DS Black Scrim (full stage)
BOBINETTE:  In front of the 2 show r.p. screens (custom for show).  Additional bobinette in slant screen
REAR PROJECTION SCREENS:  2 custom for show.  Slant screen used as projection screen also.
PIT SCRIM/SAFETY NET: Yes
CYCLORAMA:  N/A
STOCK:  Stock Escapes and Masking Softgoods as needed

Projections:
PROJECTION DESIGNER:  Wendall K. Harrington
ASSOCIATE PROJECTION DESIGNER:  Chelsea Pennebaker

Costumes:
COSTUME DESIGNER:  Santo Loquasto
YEAR BUILT: 1999
NUMBER OF HAMPERS:  8 Boxes – 21½ x 22 x 35½

Wigs/Makeup:
WIG/MAKEUP DESIGNER:  Stan Dufford

Lighting:
LIGHTING DESIGNER: Duane Schuler
NUMBER OF FOLLOW SPOTS:  4

Stage Crew Requirements:

SET UP:

         
 

Carps: 16 

Props: 10

Elecs: 13

Ward: N/A

Wigs/Makeup: N/A

RUN:

         
 

Carps: 16  

Props: 10

Elecs: 13

Ward: 8 

Wigs/Makeup: 6

STRIKE:

         
 

Carps: 16

Props: 10

Elecs: 13

Ward: N/A

Wigs/Makeup: N/A

Tech Summary:

HOURS NEEDED FOR SET UP:  Initial: 6 Hours / Run: 4 Hours

HOURS NEEDED FOR STRIKE:  Initial: 4 Hours / Run: 2 Hours

TOTAL HOURS TO SET AND FOCUS:  Initial: 6 Hours / Run 1.5 Hours

View this production summary as a pdf.